Civil Engineering stories
Finalists from more than 50 entries will vie for the Toki Paraihe, with 32 projects shortlisted across six categories.
In civil construction, the concept hinges on system boundaries, with finite resources, waste and carbon shaping whether projects can endure.
With the election looming, contractors warn promises will mean little unless parties fund a clear pipeline of infrastructure work.
Engineers could soon face registration and licensing rules designed to lift standards and improve public confidence after past failures.
Civil contractors warn the next emissions plan could slow vital infrastructure delivery unless it backs proven low-carbon options and recycling.
Auckland businesses face repeated disruptions as the transport agency’s lower wind thresholds keep forcing Harbour Bridge closures and delays.
The new paths should help Wellington residents travel more easily while diverting waste concrete and asphalt from landfill.
Construction firms have until 26 June to share views on workforce, technology and sector issues in a survey cited by MBIE.
With weather damage, economic uncertainty and an election looming, Civil Contractors New Zealand wants construction professionals to weigh in before 26 June.
Real-world subdivision design projects are giving civil engineering students hands-on experience tackling housing and water shortages across New Zealand.
A long-awaited overhaul of New Zealand’s most used building contract is intended to cut disputes and improve fairness across the sector.
Road workers and motorists could face fewer delays as traffic management shifts to site-specific risk assessments under new guidance.
Severe weather, Covid and inflation are worsening New Zealand’s infrastructure, emergency readiness and cost of living, with repairs set to take years.
Longer-lasting concrete could cut emissions by reducing replacements, as cement accounts for up to 8% of global CO2 output.
A new industry panel will shape New Zealand’s switch to risk-based roadworks safety rules, with 12 appointees chosen from 38 applicants.
Creditors will see proceeds from more than 350 pieces of late-model earthmoving kit sold in New Zealand's biggest insolvency auction of its kind.
Workers face contamination risks from flood silt, with WorkSafe warning of germs, chemicals and asbestos during clean-up.
Specialist engineers, technicians and insurance assessors can be brought in within a week to speed North Island cyclone recovery.
Auckland visitors can inspect a world-first solar passive house with 3D printed concrete walls, built to cut energy use and boost resilience.
Worksites face fresh safety guidance as WorkSafe consults on how to stop containers creating traffic, stability and stacking hazards.