Civil Engineering stories
Activity in the sector is set to return to 2020 levels as post-Covid demand eases and residential consents settle lower.
A fixed link could cut the crossing to 40 minutes, but a Cook Strait tunnel would cost about NZD $50 billion and stretch funding to breaking point.
Women make up just 11% of the sector as Te Waihanga warns future capacity pressures may hinder infrastructure delivery.
Worksafe has fined R&L Drainage NZD $275,000 after a worker was nearly buried alive in a Te Kuiti trench collapse.
Funding will help roll out mobile AI cameras that flag roadworks risks in real time, aiming to cut danger for workers and drivers.
The viaduct’s early opening has cut months off a vital coastal link, easing supply delays and proving faster delivery can save money.
Floods at the international terminal have prompted a major stormwater overhaul that will protect operations and treat runoff before it reaches the harbour.
Road crews could cut repair times and cone disruption as the first Pothole Pro lands in New Zealand for demonstrations.
Record entries underline how new plant and global best practice are helping steel contractors deliver more complex buildings across New Zealand.
A new moisture-sensing tool could cut road deterioration by 2.5 times, helping asset managers avoid costly reactive repairs across networks.
The early finish on Brisbane’s Cross River Rail is set to ease congestion, cut peak travel times and add capacity for 9,000 more passengers a day.
Only 7 percent of respondents trust the country's infrastructure to withstand extreme weather, as spending and project certainty falter.
Finalists from more than 50 entries will vie for the Toki Paraihe, with 32 projects shortlisted across six categories.
In civil construction, the concept hinges on system boundaries, with finite resources, waste and carbon shaping whether projects can endure.
With the election looming, contractors warn promises will mean little unless parties fund a clear pipeline of infrastructure work.
Engineers could soon face registration and licensing rules designed to lift standards and improve public confidence after past failures.
Civil contractors warn the next emissions plan could slow vital infrastructure delivery unless it backs proven low-carbon options and recycling.
Auckland businesses face repeated disruptions as the transport agency’s lower wind thresholds keep forcing Harbour Bridge closures and delays.
The new paths should help Wellington residents travel more easily while diverting waste concrete and asphalt from landfill.
Construction firms have until 26 June to share views on workforce, technology and sector issues in a survey cited by MBIE.